Shenzhen Guodian Technology: Connecting SMT Production Lines and Enabling Rapid Changeovers with RockPlus LIP

Smart Manufacturing in Practice


Shenzhen Guodian Technology: Connecting SMT Production Lines and Enabling Rapid Changeovers with RockPlus LIP

Smart Manufacturing in Practice

Published: 2026-11-25 15:18 Electronics Manufacturing Back to List
To address challenges in SMT production, including complex material preparation, time-consuming line changeovers, material placement errors, and fragmented equipment data, Shenzhen Guodian Technology implemented RockPlus LIP, Hegon Software's Line Integration Platform. By integrating ASM SIPLACE placement machines with the company's MES system, RockPlus LIP enables offline material preparation and verification, automated material error-proofing, rapid trolley-based changeovers, and real-time production data reporting. The solution connects material preparation, equipment operations, and production traceability, establishing a more integrated and controlled SMT production environment.

In electronics manufacturing, SMT production places high demands on material accuracy, equipment coordination, and changeover efficiency. An SMT production line involves multiple components, including placement machines, feeders, reels, material trolleys, and production work orders. Throughout the production process, manufacturers must ensure that materials are correctly matched to their designated feeders, placement positions, and production orders, while also ensuring that equipment data is accurately and promptly reported to the MES system.

These requirements become even more challenging in high-mix, low-volume manufacturing environments, where frequent product changeovers increase the workload associated with material preparation, verification, and production scheduling.

Shenzhen Guodian Technology operates multiple ASM SIPLACE SMT production lines, where offline material preparation, online material loading, material replenishment, and production data collection need to work together seamlessly. Traditional methods relying heavily on manual verification and separate system operations make it difficult to achieve the required level of changeover efficiency and material control.

The key challenge was to connect ASM placement equipment, SetupCenter, and the existing MES system without replacing the company's established MES management environment. Production schedules, material preparation, and equipment operations needed to work together through a unified integration platform.

To meet these requirements, Hegon Software implemented RockPlus LIP, integrating ASM SIPLACE placement machines with the company's MES system. The project covers six ASM SMT production lines and two Docking Stations, connecting offline material preparation, material verification, trolley onboarding, and online production data exchange into a coordinated workflow.

Offline Material Preparation and Barcode Verification: Preventing Errors Before Production

In SMT manufacturing, material preparation involves more than ensuring that sufficient materials are available. Each reel, feeder, placement position, and production order must be correctly matched. If a material mismatch is discovered only after the trolley has been connected to the production line, additional adjustments and verification may interrupt normal production operations.

RockPlus LIP works with ASM SetupCenter and the MES system to move material verification to the offline preparation stage.

Before preparation begins, operators select the relevant production line, work order, and machine location based on the production schedule in MES. The offline Docking Station and material trolley are then associated with the corresponding production schedule and machine location, establishing the required relationships for subsequent material preparation.

During preparation, operators use Android-based PDA scanners to scan the setup list, Docking Station, material trolley, and material reel barcodes in sequence. The system verifies each material against the predefined placement sequence and checks whether the reel, feeder position, and material information match the requirements in MES, including the production order and BOM.

When verification is successful, the corresponding station displays a green status. If the material does not match the designated position, the reel status is invalid, or the material conflicts with the production BOM, the system reports a verification failure and prevents the incorrect material from proceeding to production.

The system also integrates with storage location indicator lights to make material picking more efficient. After an operator scans the Docking Station area, the indicator lights identify the storage locations of the required materials, helping personnel locate the correct items more quickly and reducing manual searching and checking.

Through RockPlus LIP's integration with ASM SetupCenter and MES, offline material preparation becomes a standardized process supported by production schedules, barcode verification, and clear validation results, rather than relying solely on manual picking and inspection.

Rapid Changeovers Through Offline Preparation and Online Trolley Integration

After offline material preparation is completed, the next challenge is transferring the prepared materials to the target production line quickly and accurately.

RockPlus LIP establishes a verification mechanism between offline material trolleys and online placement machines, supporting a more efficient changeover process.

During production preparation, the system has already associated each trolley with its target production line, schedule, and machine location. When a production line is ready for a new work order, operators move the prepared trolley to the designated machine area and use an online PDA scanner to scan the machine's TABLE barcode and the trolley identification information.

The system automatically initiates an onboarding verification process, checking the trolley's production schedule, work order, machine location, and equipment connection details. Only when the relevant information matches can the trolley complete the online connection process.

If the system identifies a mismatch between the trolley, production schedule, or machine location, it reports an error and locks the corresponding feeders and material reels to prevent incorrect materials from being used in production.

By integrating these operations, tasks that previously required separate manual checks and repeated material verification become part of a coordinated system workflow. Production personnel can use pre-verified material trolleys during changeovers, reducing the need to individually recheck and reload materials at the machine.

This offline-to-online workflow provides an effective foundation for faster SMT line changeovers and more reliable material preparation.

Deep Equipment-to-MES Integration for Real-Time Production Data Exchange

For manufacturers that already operate an MES system, the value of equipment integration goes beyond simply collecting machine status information. More importantly, actual equipment events must be connected with production orders, material records, and product information maintained in MES.

Through ASM OIB interfaces and GridCom Adapter integration mechanisms, RockPlus LIP establishes data communication between ASM equipment and MES, enabling production information from equipment and supporting systems to be transmitted to the business platform.

During online production, the system captures material-related events, including initial material loading, material replenishment, material depletion, and complete reel removal. Corresponding material movement records are then transmitted to MES.

When a material reel is scanned for the first time, the system can also retrieve information associated with its unique packaging unit identification, including material number, original and remaining quantities, supplier, batch, DateCode, moisture sensitivity level, and opening time. These details are validated against the extended verification rules provided by MES.

If material information does not meet the required conditions, the system can lock the corresponding station and display an error message, preventing the material from being used until the issue is resolved.

For production traceability, RockPlus LIP connects data generated by ASM placement machines with MES. Whenever a PCB completes the placement process, relevant traceability information is uploaded, including the PCB identification, production start and end times, placement positions, corresponding reel identifiers, material quantities, supplier information, and operator details.

The system also reports placement quantities, component rejection data, and machine status changes. This allows MES to receive not only production results but also important information generated throughout the manufacturing process.

Through this event-driven integration approach, material consumption and equipment operations on the production floor become more visible in MES, providing valuable data for production monitoring and traceability.

Board Interlocking and Material Shortage Alerts for More Proactive Production Control

In addition to material verification and production data collection, RockPlus LIP extends MES business rules into equipment operations.

When a PCB enters the SMT production process, a barcode scanner or vision-based barcode reader captures its identification information. The system then requests an authorization result from MES. The production conveyor releases the board only after MES confirms that it is permitted to proceed. If verification fails, the conveyor remains blocked and an alert is displayed on the machine, preventing unauthorized or incorrect boards from entering the production process.

The system also supports material shortage alerts and replenishment notifications. When the remaining quantity of a material falls below its predefined safety threshold or the material is depleted, the relevant information can be transmitted to MES to notify warehouse and production personnel that replenishment is required.

Combined with material consumption events from ASM equipment, this mechanism helps manufacturers monitor material usage more proactively and reduce the risk of production interruptions caused by insufficient material supply.

To improve communication reliability, RockPlus LIP also maintains logs of MES interface interactions and data transmission activities. When network communication or interface requests fail, relevant data can be temporarily stored and automatically retried, reducing the risk of missing production records due to temporary communication failures.

Through the implementation of RockPlus LIP, Shenzhen Guodian Technology has connected ASM SIPLACE placement machines, offline material preparation equipment, SetupCenter, and its existing MES system into an integrated production workflow.

Material verification has been moved upstream to the offline preparation stage, trolley onboarding is automatically validated before production, and material movement, placement, and equipment status data are continuously reported to MES.

By extending equipment connectivity into production process coordination, RockPlus LIP provides more than a communication link between machines and MES. It brings together production line control, material error-proofing, rapid changeover, and production data management within a unified integration platform, providing a solid digital foundation for improving SMT automation and shop-floor management.

Phone