Selcom Electronics: Improving SMT Material Loading Accuracy and BOM Verification with RockPlus PVT
Smart Manufacturing in Practice
In SMT production, determining which component belongs at each feeder station and ensuring that the placement program uses the correct materials are essential steps before production begins. Although these activities are part of routine production preparation, they have a direct impact on assembly quality. Engineering BOMs, machine programs, and material loading lists are often maintained by different personnel. Even when part numbers appear correct, discrepancies in reference designators, feeder positions, or program configurations can introduce errors into the production process.
Once such errors are discovered after placement, troubleshooting may involve more than simply correcting a loading list. In some cases, entire production batches may require additional inspection, rework, or verification.
Selcom Electronics operates SMT production lines equipped with ASM SIPLACE placement machines, where accurate verification of program configurations and material information is an important part of production preparation. To address these requirements, Hegong Software implemented RockPlus PVT, its process error-proofing and traceability solution, focusing on placement program verification and material loading accuracy before production. The project aimed to reduce the complexity of preparing loading lists, minimize manual BOM comparisons, and make discrepancies easier to identify before they affect production.
The implementation began with data integration from the placement programming system. RockPlus PVT works with ASM SIPLACE Pro, allowing engineering personnel to locate production programs by Job, Recipe, or Setup. After selecting the required Recipe, the system retrieves feeder station configurations, component locations, and feeder information from the Setup data. It then combines these records with placement information from the Recipe, including component part numbers, placement counts (Hit), and reference designators.
This information is consolidated into a standardized Loading List, giving production personnel a clear reference for material preparation and feeder setup. Instead of manually searching through different program files and configuration tables, engineers can review the relevant information in one place.
For SMT production lines with multiple feeder stations and different material feeding methods, the organization of the loading list is equally important. The solution supports tape feeders, tray feeders, and matrix tray feeders, organizing material information according to the corresponding station and location. When the same part number is used across multiple stations, related reference designators can be consolidated to make material usage easier to review.
Different production lines and departments may also have their own requirements for loading list formats. RockPlus PVT provides configurable reporting tools that allow engineers to adjust report fields, layouts, and printing formats according to operational needs. Reports can be divided by Station or Location, while records with zero placement quantities or empty reference designators can be excluded. Component outline images can also be included to help operators visually identify materials.
Once generated, loading lists can be previewed and exported to Excel for material preparation, verification, and production handover. This reduces repetitive spreadsheet preparation and helps keep production documents consistent.
However, ensuring that a loading list matches the placement program does not necessarily mean that it matches the engineering BOM. Design revisions, program modifications, or missing reference designators can still create discrepancies between the two data sources. When verification relies entirely on manual Excel comparisons, identifying these differences can be time-consuming, particularly for products containing large numbers of components.
To address this challenge, RockPlus PVT incorporates BOM verification capabilities into the production preparation workflow.
The system supports importing BOM files in Excel format from designated file directories or local storage. Based on the structure of the source file, users can map fields such as parent assembly, component part number, description, quantity, and reference designator. The imported BOM data is then compared with the previously generated loading list. Configurable parsing rules also help accommodate different BOM formats, reducing the need for manual data preparation.
Verification goes beyond checking whether a part number exists in both files. The system also examines where each component is expected to be placed.
By comparing the reference designators in both the BOM and the placement program, RockPlus PVT can identify part number mismatches, missing placement positions, and additional reference designators. Matching and mismatching results are displayed using green and red indicators, making discrepancies easier to recognize.
For mismatched materials, the comparison report identifies the specific reference designators that differ between the two data sources. A separate report can also highlight materials missing from the BOM comparison. These results can be exported to Excel for further review and correction.
For example, if a component is assigned to several positions in the BOM but one of those positions is missing from the actual Recipe, the verification tool can highlight the discrepancy in the comparison report. Engineers can then review the BOM and placement program directly, rather than searching through numerous feeder stations and component records to locate the issue.
The system also supports parsing reference designators separated by commas, semicolons, or expressed as consecutive ranges, allowing it to accommodate different conventions commonly used in engineering BOMs.
In addition to loading list generation and discrepancy reporting, the project includes a dedicated BOM-assisted reporting tool. When exporting Loading Lists, the tool can associate BOM information such as manufacturer part numbers (MPNs) and component descriptions with the corresponding placement records.
The resulting reports bring together feeder positions, feeder types, component part numbers, placement quantities, reference designators, and material descriptions. This allows production operators to verify not only which component should be loaded at a particular station but also its associated engineering information and placement locations, reducing the need to consult multiple documents during preparation.
For shop-floor use, the solution also supports generating SIPLACE QuickStart barcodes and including them in the corresponding loading lists. These barcodes provide a convenient reference for subsequent station identification and loading verification at the machine.
Through the application of RockPlus PVT, information previously distributed across placement programs, engineering BOMs, and Excel reports can be collected and associated within a more consistent production preparation workflow.
For engineering personnel, program selection, loading list generation, and BOM comparison become part of a more standardized process. For production operators, the loading documents provide more complete information about feeder locations, materials, and placement requirements.
When production jobs change or BOM revisions are introduced, engineers can retrieve updated Recipe data and perform another comparison to identify any discrepancies resulting from configuration changes.
The RockPlus PVT implementation at Selcom Electronics focuses on details that are easily overlooked before SMT placement begins: whether the correct materials have been selected, whether any reference designators are missing, and whether the loading list accurately reflects the actual machine program.
By bringing these verification activities into the production preparation stage, RockPlus PVT helps reduce unnecessary manual checks, improves the consistency of loading information, and provides a more reliable data foundation for process error prevention and quality management.
More Case Studies





