RockPlus PVT Brings Trial BOM Version Control and Material Error Prevention into Production Preparation
Smart Manufacturing in Practice
In automotive electronics development and trial production, a Bill of Materials (BOM) rarely remains unchanged after its initial creation. From A-sample to B-sample and C-sample development stages, component models, quantities, packaging specifications, and PCB placement references may change as product designs are verified and manufacturing processes are refined. For SMT trial production, these changes require more than simply updating a component list. They directly affect material preparation, component loading, and the results of subsequent production trials.
Compared with mass production, trial manufacturing typically involves smaller batches, more product revisions, and frequently changing material requirements. When BOM information is still exchanged primarily through Excel files, engineering, material management, and production teams must repeatedly confirm file versions and manually compare changes between component lists. Using an outdated BOM or overlooking a component modification can result in incorrect material preparation, even when the production equipment itself is operating normally.
To address these challenges, Hasco Vision introduced Hegong Software's RockPlus PVT Process Verification and Traceability System as part of its SMT trial BOM management project. The solution focuses on bringing material verification forward into the production preparation stage through BOM import validation, revision comparison, material relationship management, and material requisition generation. This allows production teams to work from clearly defined material requirements before trial manufacturing begins.
Engineers can continue using familiar Excel templates to prepare trial BOMs, but importing these files involves more than simply uploading and saving them. The RockPlus PVT-based application provides a guided import process that reads product models, part numbers, revision information, material codes, specifications, manufacturers, footprints, quantities, and component reference designators according to predefined templates.
During the import process, the system performs format validation and displays an online preview, allowing engineers to review the information before it is saved. Material codes are also checked against registered master data, helping prevent incomplete or unrecognized material information from entering the subsequent requisition process.
In practice, managing BOM changes becomes more challenging after the initial version has been created. Sometimes only one component needs to be replaced. In other cases, the component itself remains unchanged, but its placement reference or required quantity is modified. For a PCB containing numerous electronic components, manually comparing different Excel files can be time-consuming, and small but important changes may easily be overlooked.
To simplify this process, RockPlus PVT supports BOM revision comparison during the import of updated material lists. The system compares the new BOM against the previous version using material codes and component reference designators, identifying newly added components, removed components, material modifications, and placement reference changes.
Differences are highlighted using distinct colors, allowing engineers to review the modifications before confirming the import. Instead of searching through multiple spreadsheets line by line, they can identify which materials have changed and determine whether the new BOM accurately reflects the latest design requirements.
After verification, a BOM can be moved from draft status to an officially released version. Once published, the BOM is locked against direct modification. Any subsequent changes must be managed through a new revision. When an already published BOM is imported again, the system creates a new version according to its revision management rules, preserving the material information associated with earlier development stages.
This approach accommodates continuous engineering changes during trial production while reducing the confusion caused by repeatedly overwriting BOM files. Engineers and production personnel can identify which version is currently valid and review material configurations from previous revisions when necessary.
RockPlus PVT also incorporates email notifications for BOM import and release activities, helping relevant engineering and material management personnel stay informed about version updates. For components with approved alternatives, the application provides functions for managing relationships between primary and substitute materials.
Where temporary material substitutions are required, corresponding identification and records can be maintained, helping operators distinguish between standard material requirements and temporary adjustments during preparation.
However, effective BOM management is not limited to helping engineers identify changes. Once a trial production task is ready to begin, the approved BOM must also be translated into specific material requirements.
During work order preparation, the RockPlus PVT-based application allows production work orders to be associated with released product BOMs. After selecting the appropriate BOM and entering the planned trial production quantity, the system calculates the total material requirements based on the quantity of each component specified in the BOM.
For example, if several units of a particular component are required for each PCB, the application calculates the corresponding total demand according to the work order quantity. The resulting material requisition list and preparation tasks can be generated automatically, reducing the need for manual calculations and repeated preparation of material spreadsheets.
These material lists can also be exported for use in material preparation and verification. Combined with the application's material master data, inventory, and material transaction management functions, warehouse and production personnel can review material requirements in relation to specific work orders and arrange subsequent picking and issuing activities.
Information that was previously maintained separately in engineering BOMs, production work orders, and material requisition sheets can therefore be linked through consistent records.
This relationship is particularly important in trial manufacturing environments. When several revisions of the same product are being developed, operators need to confirm not only the product model but also the exact BOM revision associated with the current work order, the required components, and whether the quantities match the planned trial build.
By connecting BOM revisions with work order material requirements, RockPlus PVT helps production teams prepare materials according to approved specifications rather than relying on repeated file exchanges or verbal confirmation between departments.
Through the management interface, engineers can review BOM contents and release statuses across different product revisions, examine historical material configurations, and verify changes between versions. Production and material management teams can retrieve the corresponding material requisition information based on the active work order.
When questions arise regarding material usage during trial production, personnel can refer to the product, BOM revision, and work order records to identify the material requirements applicable at that time. This provides a clearer basis for investigating discrepancies that might otherwise be difficult to trace across separate documents and systems.
For RockPlus PVT, process error prevention is not limited to detecting abnormalities or stopping equipment during manufacturing. In this project, verification begins before materials reach the SMT production line.
BOM data is validated during import, revision differences are identified before approval, published versions are controlled, and material preparation tasks are generated from confirmed requirements. By making material information more accurate and accessible before production begins, RockPlus PVT provides a stronger foundation for trial manufacturing execution and subsequent quality traceability.