Scanfil Electronics: Streamlining SMT Component Part Number Management and Error-Proofing with RockPlus PVT
Smart Manufacturing in Practice
In SMT manufacturing, component part numbers are used not only for material identification but are also closely associated with placement machine Boards, Jobs, and production programs. For electronics manufacturers with years of accumulated engineering data, SIPLACE Pro may contain numerous components that serve the same function but have different part numbers or material paths due to historical data management practices, changes in material coding, or component library maintenance.
When manufacturers need to standardize these part numbers, engineers typically have to locate the relevant Boards, modify component information individually, and verify that the updated production programs still meet placement requirements. This process becomes increasingly time-consuming and error-prone as the number of components and associated production programs grows.
Scanfil Electronics (Suzhou) faced similar challenges in managing its SIPLACE Pro engineering data, where a large volume of historical component records made manual part number modifications inefficient and difficult to control. To address these requirements, Hegong Software designed a batch component modification solution incorporating the error-proofing and traceability principles of RockPlus PVT. The solution brings Board selection, replacement mapping verification, part number modification, and Job optimization into a structured workflow, helping reduce the risks associated with inconsistent engineering data.
The Challenges of Maintaining Multiple Part Numbers for Equivalent Components
In SMT engineering management, component libraries and placement programs are closely connected. A single component may be referenced by multiple Boards, while different Boards can be associated with different Jobs, Recipes, and placement positions.
When an existing component part number needs to be replaced with a standardized number, updating the component library alone may not be sufficient. If the corresponding component references within related Boards are not reviewed and updated accordingly, inconsistencies may arise between engineering data and production programs.
Another challenge is identifying the complete scope of modification. Engineers often need to search through SIPLACE Pro directories repeatedly, locate relevant Boards, and manually verify the relationship between original and replacement part numbers. For modification tasks involving multiple products and large amounts of placement data, repetitive operations increase the likelihood of missed updates, incorrect replacements, or the selection of part numbers that do not exist in the component library.
Furthermore, modifying a part number is not simply a matter of replacing a text string. The updated component information must remain compatible with the placement machine's programming requirements, and any potential impact on Job optimization must be considered.
Without verification before modification and validation afterward, problems may remain undetected until the production preparation stage, even when the apparent part number changes have been completed.
With these considerations in mind, Hegong Software incorporated modification scope confirmation and component data verification into the customized RockPlus PVT solution, helping engineers establish a reliable basis for engineering data changes before updating production programs.
From Individual Board Searches to Batch Selection and Verification
To address the challenges of managing large numbers of Boards across complex SIPLACE Pro directory structures, the project introduced a dedicated component batch modification interface integrated with the SIPLACE Pro data environment.
Engineers can browse existing Boards through a hierarchical directory tree or use keyword filtering to locate specific engineering objects. The interface supports selecting multiple Boards within a single task and displays the full paths of selected Boards, allowing users to review the modification scope before proceeding.
Compared with opening and editing individual Boards manually, this approach brings engineering objects distributed across different directories into a centralized workflow. It provides greater visibility into the selected scope and reduces the possibility of overlooking Boards during preparation.
The RockPlus PVT solution also incorporates Excel-based part number replacement mapping. Engineers can maintain the relationships between existing and target part numbers in a predefined Excel template and import the file for centralized verification.
During import, the system parses the replacement mappings, excludes entries where the original and target part numbers are identical, and removes duplicate mappings. It then checks the target part numbers against the existing SIPLACE Pro component library to determine whether the required components are available.
When a target component cannot be found in the library, the interface identifies the missing entry so that engineers can complete the required component data maintenance before proceeding with subsequent modifications.
This verification mechanism transforms what would otherwise be a series of manual checks into a centralized, reviewable data set, enabling engineers to identify potential master data issues before executing part number changes.
Connecting Component Modifications with Job Optimization
In SMT production, engineering data maintenance does not end when a component part number is updated. The associated production Jobs must also be checked to ensure that the modified programs remain suitable for placement operations.
This becomes particularly important when changes involve multiple Boards or panelized structures, where different placement positions may reference the same component part number.
To address these requirements, the RockPlus PVT-based solution includes a planned workflow connecting batch component replacement with SIPLACE Pro Job optimization.
Based on the selected Boards and imported replacement mappings, the workflow is designed to identify matching component references in the relevant placement lists, replace them with the specified target part numbers, and invoke the SIPLACE Pro Job Optimizer for second-stage optimization.
To help engineers monitor the process, the modification wizard includes a framework for displaying task progress, processing time, and operation messages. The planned optimization result interface also provides information such as Job status, error counts, warning counts, optimization levels, and relevant descriptions.
These results are intended to help engineers identify potential issues after production program modifications rather than treating a completed part number replacement as sufficient confirmation of success.
Because changes to engineering data may directly affect subsequent placement operations, the proposed workflow also retains manual review for optimization errors or warnings. Engineers can evaluate the reported issues and determine whether additional adjustments are necessary before the modified programs are used in production.
In this application, RockPlus PVT emphasizes verification before modification and validation of the associated production programs afterward, creating a more controlled approach to engineering data maintenance.
Maintaining Modification Records for Engineering Data Traceability
In manufacturing environments, component coding standards and material management requirements may change over time, resulting in repeated updates to engineering data.
Without a reliable modification history, engineers investigating a production program issue may have difficulty identifying which part numbers were previously changed, which replacement relationships were applied, or whether the associated Jobs underwent optimization checks.
To support traceability, the project includes a dedicated data structure designed to link each batch modification task with its associated Boards, original component part numbers, replacement part numbers, and Job optimization results.
Under this design, each task can retain information about processing status, optimization duration, errors, warnings, and related messages. Detailed records can also be maintained for individual Board and component replacements, providing a structured history of engineering data changes.
Together with application operation logs, these records are intended to support subsequent engineering reviews, troubleshooting, and verification of modification activities.
Rather than introducing an entirely separate engineering data environment, the solution is designed around the existing SIPLACE Pro system. It focuses on practical challenges associated with fragmented component maintenance, complex replacement mapping verification, and the lack of consistent modification records.
By applying the error-proofing principles of RockPlus PVT to a customized component maintenance workflow, the project establishes a structured approach that begins with identifying the modification scope and validating target components, then connects to planned batch updates, program optimization, and change traceability.
This approach provides a foundation for more consistent SMT engineering data management while helping reduce the risks associated with manual component part number maintenance.